CLOSED: This survey has concluded.
Birmingham Senior/Recreation Center Community Survey
This preliminary survey was conducted in 2024 in conjunction with the architects at NORR, LLC who conducted the initial building assessment of 400 E. Lincoln.
This preliminary survey was conducted in 2024 in conjunction with the architects at NORR, LLC who conducted the initial building assessment of 400 E. Lincoln.